PLAY
IG FB YT IN
↑
Baltic Towers production hall – wind tower segments
VIDEO · PHOTOWEB · SIGNAGEGDAŃSK / PL
← Portfolio / Work SEZMOO × Baltic Towers · Long-term partnership

Baltic
Towers.

We were on this project before the hall went up. We told the story of Baltic Towers: from the first films and the construction site, through recruitment and trade fairs, to the factory opening and signage for the hall and office.

Client
Baltic Towers Offshore wind towers
Period
2023–present
Format
Partnership Long-term
Scope
Video · Photo Web · Hall and office signage
ABOUT THE PARTNERSHIP

A factory we’ve worked with
from the foundations.

Baltic Towers built a wind tower factory for offshore farms in Gdańsk. When we started working together, there was no hall yet. There was a plan, a construction site and a need for investors, partners and future employees to hear about the company.

We were with the client at every stage. Our team filmed the construction, shot the recruitment campaign, prepared trade-fair materials, covered the opening and designed the hall’s interior and exterior signage.

STAGES OF THE PARTNERSHIP

From an empty site
to a working factory.

01

First films – before the hall existed

We shot the first Baltic Towers materials when the factory existed only on paper, showing the company’s vision and the place where the hall would stand.

02

Building the hall – video and photo

We documented the construction regularly, from the ground and from a drone. The result is an archive of how one of the largest production halls in the region grew out of a building site.

03

Recruitment campaign

The factory needed welders, operators and fitters. We shot recruitment films with 12 actors and cut them into more than 40 formats for social media, job ads and paid campaigns, plus photo sessions on the production floor.

04

Landing page

We designed the recruitment page all the ads pointed to: job offers, films and the application form in one place.

05

Trade-fair films

We made films for Baltic Towers’ trade-fair stands, showing the factory and the scale of production where the company met offshore industry partners.

06

Hall opening

We produced the official factory film and coverage of the hall’s opening ceremony.

07

Hall and office signage

Finally, we designed and installed signage for the whole plant:
Hall: 4 × 2 m boards and a system of smaller boards and plates.
Office: frosted glass film with wind tower motifs.
Reception: 3D logo.
Offices: smaller PVC logos.
The same mark leads from the entrance, through the office, to the production hall.

FILMS

Recruitment campaign.

Play the Baltic Towers recruitment film
● RECBALTIC TOWERS, RECRUITMENT
FILMS

Hall opening.

Play the Baltic Towers hall opening film
● RECBALTIC TOWERS, OPENING
FILMS

3D factory model.

Play the Baltic Towers 3D factory animation
● RECBALTIC TOWERS, 3D MODEL
PHOTOGRAPHY

Production
and people.

Photo sessions for the recruitment campaign.

See more → Portfolio → All SEZMOO work